GC Non-Payroll Dashboard
The Morgan Group

Sign in to access the dashboard

GC Non-Payroll Expenses

May 2026

Key Takeaways

Current Portfolio Snapshot

Total Active Projects
Currently Over Budget
Trending Over
Above $35K This Month

This Month's Highlights

Active Projects
Under Budget Over Budget Trending Over Completed
Portfolio Monthly Spend by Category

$35K Threshold Tracker

Projects vs Threshold
The $35K red line represents the monthly GC G&A budget benchmark. Projects trending toward or above this line require escalation. Projects with less than 6 months of reporting data are excluded from the Trailing 6-Month average.

Project Health Scorecards

Select a project

Choose a project from the dropdown above to view detailed spend analysis.

Budget Analysis

Budget Consumption — Active Projects

Parenthesis indicates months since project inception.

Burn Rate Comparison

The $35K red line represents the monthly GC G&A budget benchmark. Projects trending toward or above this line require escalation. Projects with less than 6 months of reporting data are excluded from the Trailing 6-Month average.

Portfolio Comparison

By Region
Bold = active project. Parenthesis (#) indicates months since inception. T6 Avg Rate is blank for projects with fewer than 6 months of spend data and for all completed projects. Rate-based metrics for completed projects are directional only — active construction duration has not been normalized for pre-NTP ramp-up or post-CO wind-down spend.
By Property Type
Bold = active project. Parenthesis (#) indicates months since inception. T6 Avg Rate is blank for projects with fewer than 6 months of spend data and for all completed projects. Rate-based metrics for completed projects are directional only — active construction duration has not been normalized for pre-NTP ramp-up or post-CO wind-down spend.

Projection Summary

N/A appears for projects with less than 6 months of history, as the Trailing 6 rate cannot be calculated.

All Categories

Top 5 Categories
All Categories

Line Items

Project × Category Heatmap

Reflects top 15 spend categories by total dollar amount in the selected scope.

Completed Projects

Rate-based metrics for completed projects are directional only — active construction duration has not been normalized for pre-NTP ramp-up or post-CO wind-down spend.

Category Name